Votre navigateur ne supporte pas le javascript. La navigation risque d'être perturbée!
chargement
IEC light

IEC light

The low footprint IEC solution to connect vessels to shore power! IEC

IEC LIGHT by NG3
NG3 - IEC LIGHT by NG3 - Illustration

IEC 80 0005 standard solution has been on the market for more than a decade now days for RoPAx vessels, using crane systems to bring IEC manual connector within the reach of the crew who connect it.

With IEC LIGHT, NG3 offers a alternate, self-standing solution to reduce drastically the relevant port engineering.

Main features and benefits

  • Self standing structure 20 feet ISO container type depending on tide / deck locations
  • No foundation required
  • Based on sound and reliable mechanical effects
  • Compliant with 11kVolt 80 005 IEC standard
  • Compliant with CE machinery directive and EUROCODE
  • Can be easily relocated to another quay/harbour
  • Compatible with large tide variations
  • Design can be adapted to extreme tide variations & deck locations (up to 40 feet ISO container size)
  • Remote control by crew
  • Easy access for maintenance
  • Automated cable tension monitoring, with alarms
  • Standard design for both ship and terminal side interfaces
  • Environmentally friendly (optimizes use of steel and avoids concrete foundations and heavy harbour engineering …)
  • Installation on board is straightforward ⇒ no specific skills needed for yard
  • Low Maintenance, easily performed by terminal personnel
  • Moving parts protected from weather
  • Can be winterized based on previous arctic projects experience

IEC LIGHT in details

Document à télécharger

IEC Light photo header
IEC Light photo header