These two vessels
These two vessels will be equipped with a 2000 Ampère/1 kVolt PLUG interface identical to their fleet sisters, to be commissioned, COVID permitting, by the end of 2020.
Publié le 31 décembre 2021
These two vessels will be equipped with a 2000 Ampère/1 kVolt PLUG interface identical to their fleet sisters, to be commissioned, COVID permitting, by the end of 2020.